ITAC Assessment: ME0255
ITAC logo
ITAC Assessment: ME0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product glass slides
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 95,000
ft2
Annual Production 27,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $330,657 4,549,824
kWh
Electricity Demand $82,255 10,458
kW-mo/yr
Electricity Fees $5,258 -
Natural Gas $46,239 8,230
MMBtu
LPG $4,105 150
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,986 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,993

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 4.612: Contract out maintenance $32,242 $75,900 $10,742
134,232
kWh
- - - $21,500
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,877 $21,500 $13,524
168,816
kWh
$2,136
-
kW-mo/yr
$(-3,783.0)
-
MMBtu
- -
03 4.231: Purchase equipment instead of leasing $3,760 $20,100 - - - - $3,760
04 2.4239: Eliminate or reduce compressed air usage $2,503 $12,300 $2,047
25,791
kWh
$456
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $2,747 $7,023 $2,297
28,722
kWh
$450
-
kW-mo/yr
- - -
06 4.211: Consider use / purchase of bulk materials where possible $2,059 $8,900 - - - - $2,059
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,060 $3,860 $535
6,741
kWh
$1,686
-
kW-mo/yr
$(-161.0)
-
MMBtu
- -
08 2.2437: Recover waste heat from equipment $1,945 $2,860 $1,945
79,426
kWh
- - - -
09 3.4111: Use closed cycle process to minimize waste water production $11,059 $7,193 - - $4,944
-
MMBtu
$6,115
-
Tgal
-
10 3.4111: Use closed cycle process to minimize waste water production $9,734 $15,640 $(-309.0)
(-3,224)
kWh
- $4,385
-
MMBtu
$5,658
-
Tgal
-
TOTAL RECOMMENDED $79,986 $175,276 $30,781
440,504
kWh
$4,728
-
kW-mo/yr
$5,385
-
MMBtu
$11,773
-
Tgal
$27,319
TOTAL IMPLEMENTED $47,993 $92,976 $14,984
242,380
kWh
$450
-
kW-mo/yr
$4,944
-
MMBtu
$6,115
-
Tgal
$21,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs