ITAC Assessment: LL0306
ITAC logo
ITAC Assessment: LL0306
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Light fixtures
NAICS 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $1
M
to 5
M
# of Employees 42
Plant Area 35,000
ft2
Annual Production 2,600
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,430 285,200
kWh
Electricity Fees $1,156 -
Natural Gas $8,242 685
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,424

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $8,543 $2,810 $8,230
77,130
kWh
$313 -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $5,929 $1,440 $5,712
53,529
kWh
$217 -
03 2.7224: Reduce space conditioning during non-working hours $2,949 $1,716 $2,841
26,627
kWh
$108 -
04 4.611: Begin a practice of predictive / preventative maintenance $1,767 $90 $257
2,413
kWh
$10 $1,500
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,728 $880 $1,665
15,609
kWh
$63 -
06 2.4231: Reduce the pressure of compressed air to the minimum required $701 $10 $675
6,325
kWh
$26 -
07 2.7135: Install occupancy sensors $256 $375 $247
2,313
kWh
$9 -
08 2.6211: Conserve energy by efficient use of vending machines $46 $156 $44
416
kWh
$2 -
TOTAL RECOMMENDED $21,919 $7,477 $19,671
184,362
kWh
$748 $1,500
TOTAL IMPLEMENTED $9,424 $2,410 $7,634
71,551
kWh
$290 $1,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs