ITAC Assessment: ME0254
ITAC logo
ITAC Assessment: ME0254
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product ball valves and actuators
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 87,500
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 4,125
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,746 565,944
kWh
Electricity Demand $16,719 2,022
kW-mo/yr
LPG $17,919 2,531
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,969 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,883 $25,900 n/a $6,973
77,374
kWh
$1,910
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $1,601 $14,083 n/a $986
10,844
kWh
$615
-
kW-mo/yr
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,320 $2,600 n/a $578
4,689
kWh
$893
-
kW-mo/yr
$(-151.0)
-
MMBtu
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $911 $450 n/a $881
9,672
kWh
$446
-
kW-mo/yr
$(-416.0)
-
MMBtu
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $830 $500 n/a $830
9,086
kWh
- - - -
06 2.4221: Install compressor air intakes in coolest locations $304 $300 n/a $304
3,224
kWh
- - - -
07 3.3131: Use evaporation to concentrate material $6,872 $17,050 n/a - - $(-1,295.0)
-
MMBtu
$8,167
-
gal
-
08 3.3133: Use other waste concentration methods $6,248 $6,950 n/a - - - - $6,248
TOTAL RECOMMENDED $26,969 $67,833 $10,552
114,889
kWh
$3,864
-
kW-mo/yr
$(-1,862.0)
-
MMBtu
$8,167
-
gal
$6,248
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs