ITAC Assessment: ME0247
ITAC logo
ITAC Assessment: ME0247
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product shoes
NAICS
n/a
SIC 3144: Women's Footwear, Except Athletic
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 75,000
ft2
Annual Production 1,750,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,065 1,545,428
kWh
Electricity Demand $59,765 6,388
kW-mo/yr
Electricity Fees $5,076 -
LPG $559 24
MMBtu
Fuel Oil #4 $33,548 8,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,658 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $89,328

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Other Liquid (haz) Savings Administrative Changes Savings
01 4.212: Adopt in-house material generation $33,500 $25,500 - - - - $33,500
02 4.231: Purchase equipment instead of leasing $4,122 $16,460 - - - - $4,122
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,100 $600 $3,100
44,256
kWh
- - - -
04 2.4234: Cool compressor air intake with heat exchanger $1,398 $500 $1,398
78,253
kWh
- - - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,102 $1,700 $879
9,086
kWh
$493
-
kW-mo/yr
$(-270.0)
-
MMBtu
- -
06 2.6212: Turn off equipment during breaks, reduce operating time $360 - $360
5,275
kWh
- - - -
07 3.2176: Increase use of automation $45,746 $25,500 - - - $45,746
-
gal
-
08 3.2123: Convert to high volume low pressure (hvlp) paint guns $3,330 $1,251 - - - $3,330
-
gal
-
TOTAL RECOMMENDED $92,658 $71,511 $5,737
136,870
kWh
$493
-
kW-mo/yr
$(-270.0)
-
MMBtu
$49,076
-
gal
$37,622
TOTAL IMPLEMENTED $89,328 $70,260 $5,737
136,870
kWh
$493
-
kW-mo/yr
$(-270.0)
-
MMBtu
$45,746
-
gal
$37,622
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs