Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Modified Food Starch
NAICS
n/a
SIC 2046: Wet Corn Milling
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 63,265
ft2
Annual Production 36,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $365,388 6,065,944
kWh
Electricity Demand $88,615 10,987
kW-mo/yr
Electricity Fees $2,084 -
Fuel Oil #2 $33,326 6,288
MMBtu
Fuel Oil #6 $122,527 30,069
MMBtu
Wood $88,377 31,145
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,628 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,826

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Fuel Oil #6 Savings Wood Savings Water Disposal Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $20,829 $46,000 - - - $20,829
-
MMBtu
- -
02 2.4133: Use most efficient type of electric motors $6,526 $27,594 $5,311
88,511
kWh
$1,215
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,300 $18,666 $5,320
88,804
kWh
$980
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $2,349 $400 $2,349
39,273
kWh
- - - - -
05 2.2511: Insulate bare equipment $830 $231 $277
3,810
kWh
- $87
-
MMBtu
$466
-
MMBtu
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $709 $1,406 $709
11,723
kWh
- - - - -
07 2.2511: Insulate bare equipment $276 $29 $276
4,689
kWh
- - - - -
08 3.4151: Minimize water usage $3,051 $273 - - - - - $3,051
-
Tgal
09 3.4151: Minimize water usage $1,758 $3,702 $288
(-4,689)
kWh
- - $492
-
MMBtu
$495
-
MMBtu
$483
-
Tgal
TOTAL RECOMMENDED $42,628 $98,301 $14,530
232,121
kWh
$2,195
-
kW-mo/yr
$87
-
MMBtu
$21,787
-
MMBtu
$495
-
MMBtu
$3,534
-
Tgal
TOTAL IMPLEMENTED $12,826 $46,260 $10,631
177,315
kWh
$2,195
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Fuel Oil #6 Savings Wood Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs