ITAC Assessment: ME0232
ITAC logo
ITAC Assessment: ME0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product fleece slippers
NAICS
n/a
SIC 3142: House Slippers
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area 200,000
ft2
Annual Production 1,791,875
pieces
Production Hrs. Annual 2,285
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,461 589,683
kWh
Electricity Demand $19,555 2,271
kW-mo/yr
Electricity Fees $904 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,783

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,240 $3,297 $883
12,603
kWh
$357
-
kW-mo/yr
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $823 $200 $823
7,620
kWh
- - - - - -
03 4.821: Pay bills on time to avoid late fees $435 - - - - - $435 - -
04 2.4221: Install compressor air intakes in coolest locations $385 $400 $385
3,517
kWh
- - - - - -
05 3.6192: Use a less expensive method of waste removal $8,400 - - - - - $8,400 - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $4,670 $9,747 - - $3,570
-
lb
- - $1,100 -
07 3.5313: Increase amount of waste recovered for resale $414 $250 - - - $414
-
lb
- - -
08 3.5313: Increase amount of waste recovered for resale $50 - - - - - - - $50
TOTAL RECOMMENDED $16,417 $13,894 $2,091
23,740
kWh
$357
-
kW-mo/yr
$3,570
-
lb
$414
-
lb
$8,835 $1,100 $50
TOTAL IMPLEMENTED $6,783 $13,244 $1,706
20,223
kWh
$357
-
kW-mo/yr
$3,570
-
lb
- - $1,100 $50
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs