Assessment Year 1997
Principal Product dowels and glue pins
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 37,500
ft2
Annual Production 434,477,628
pieces
Production Hrs. Annual 2,520
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $5,691 84,115
kWh
Electricity Demand $25,791 3,112
kW-mo/yr
Electricity Fees $6,105 -
Fuel Oil #2 $5,140 658
MMBtu
Wood $49,985 37,139
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,817 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,527 $20,000 $12,527
178,781
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,057 $8,690 $4,017
57,444
kWh
$2,040
-
kW-mo/yr
- - -
03 2.2511: Insulate bare equipment $2,029 $1,380 - - $2,029
-
MMBtu
- -
04 2.8121: Apply for tax-free status for energy purchases $879 - - - - - $879
05 2.4133: Use most efficient type of electric motors $683 $1,230 $563
8,206
kWh
$120
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $331 $185 $331
4,689
kWh
- - - -
07 3.5313: Increase amount of waste recovered for resale $4,311 $986 - - - $4,311
-
lb
-
TOTAL RECOMMENDED $26,817 $32,471 $17,438
249,120
kWh
$2,160
-
kW-mo/yr
$2,029
-
MMBtu
$4,311
-
lb
$879
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs