ITAC Assessment: ME0222
ITAC logo
ITAC Assessment: ME0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Compact Discs
NAICS
n/a
SIC 3652: Phonograph Records and Prerecorded Audio Tapes and Disks
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 100,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $327,364 4,823,564
kWh
Electricity Demand $75,050 8,676
kW-mo/yr
Electricity Fees $11,693 -
LPG $260 13
MMBtu
Fuel Oil #2 $24,524 6,195
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,559 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,496

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Other Liquid (haz) Savings Administrative Changes Savings
01 3.6112: Use filter and drying oven to reduce sludge volume $9,095 $13,750 $7,137
101,993
kWh
$698
-
kW-mo/yr
- - $1,260
-
gal
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,935 $32,965 $6,578
94,080
kWh
$2,357
-
kW-mo/yr
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,719 $4,446 $4,719
67,409
kWh
- - - - -
04 2.4239: Eliminate or reduce compressed air usage $3,862 $6,000 $3,862
55,100
kWh
- - - - -
05 2.4221: Install compressor air intakes in coolest locations $1,648 - $1,648
23,447
kWh
- - - - -
06 2.8121: Apply for tax-free status for energy purchases $1,398 - - - - - - $1,398
07 4.821: Pay bills on time to avoid late fees $1,291 - - - - - - $1,291
08 2.2437: Recover waste heat from equipment $910 $2,032 - - $910
-
MMBtu
- - -
09 2.4133: Use most efficient type of electric motors $458 $1,150 $367
5,275
kWh
$91
-
kW-mo/yr
- - - -
10 2.8121: Apply for tax-free status for energy purchases $16 - - - - - - $16
11 3.6125: Sell combustible waste $150 - - - - - $150
-
gal
-
12 3.4155: Meter waste water $77 $424 - - - $77
-
Tgal
- -
TOTAL RECOMMENDED $32,559 $60,767 $24,311
347,304
kWh
$3,146
-
kW-mo/yr
$910
-
MMBtu
$77
-
Tgal
$1,410
-
gal
$2,705
TOTAL IMPLEMENTED $26,496 $52,735 $20,449
292,204
kWh
$3,146
-
kW-mo/yr
- $77
-
Tgal
$1,410
-
gal
$1,414
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs