ITAC Assessment: ME0214
ITAC logo
ITAC Assessment: ME0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product filter bags
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 52,400
ft2
Annual Production 12,500,000
pieces
Production Hrs. Annual 2,825
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,824 464,244
kWh
Electricity Demand $13,657 1,617
kW-mo/yr
Electricity Fees $1,125 -
Natural Gas $23,719 3,826
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,401 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,965

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 4.623: Employ modular jigs to reduce process set-up time $24,500 $7,500 - - - $24,500
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,079 $31,719 $3,355
47,773
kWh
$1,724
-
kW-mo/yr
- -
03 4.214: Purchase appropriately sized material $4,000 $2,840 - - - $4,000
04 4.652: Replace existing equipment with more suitable substitutes $2,400 $800 - - - $2,400
05 2.8121: Apply for tax-free status for energy purchases $1,351 - - - - $1,351
06 2.2515: Use optimum thickness insulation $816 $75 $816
11,723
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $604 - $604
8,499
kWh
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $387 $30 $387
5,569
kWh
- - -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $832 $6,200 - - $832
-
lb
-
10 3.5212: Regrind, reuse, or sell scrap plastic parts $3,432 $6,200 - - $832
-
lb
$2,600
TOTAL RECOMMENDED $43,401 $55,364 $5,162
73,564
kWh
$1,724
-
kW-mo/yr
$1,664
-
lb
$34,851
TOTAL IMPLEMENTED $36,965 $48,364 $4,558
65,065
kWh
$1,724
-
kW-mo/yr
$832
-
lb
$29,851
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs