ITAC Assessment: CO0035
ITAC logo
ITAC Assessment: CO0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product POWER SUPPLIES
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area
n/a
Annual Production 21,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,888 1,279,895
kWh
Natural Gas $24,040 5,124
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,357 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,357

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6124: Establish equipment maintenance schedule $3,550 $50 $3,550
63,306
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $11,285 $2,000 $6,755
120,164
kWh
$4,530
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $100 $20 $100
1,758
kWh
-
04 2.7221: Lower temperature during the winter season and vice-versa $1,959 $4,000 $1,959
35,170
kWh
-
05 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $1,596 $24 $132
2,345
kWh
$1,464
-
MMBtu
06 2.3191: Use demand controller or load shedder $2,229 $6,000 $2,229
-
kWh
-
07 2.7111: Reduce illumination to minimum necessary levels $8,638 $4,302 $8,638
153,869
kWh
-
TOTAL RECOMMENDED $29,357 $16,396 $23,363
376,612
kWh
$5,994
-
MMBtu
TOTAL IMPLEMENTED $29,357 $16,396 $23,363
376,612
kWh
$5,994
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs