Assessment Year | 1985 |
---|---|
Principal Product | POWER SUPPLIES |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 225 |
Plant Area |
n/a
|
Annual Production | 21,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,888 | 1,279,895 |
kWh
|
$0.056 |
Natural Gas | $24,040 | 5,124 |
MMBtu
|
$4.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,357 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,357 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6124: Establish equipment maintenance schedule | $3,550 | $50 |
$3,550
63,306
kWh
|
- | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $11,285 | $2,000 |
$6,755
120,164
kWh
|
$4,530
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $100 | $20 |
$100
1,758
kWh
|
- | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $1,959 | $4,000 |
$1,959
35,170
kWh
|
- | |
05 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $1,596 | $24 |
$132
2,345
kWh
|
$1,464
-
MMBtu
|
|
06 | 2.3191: Use demand controller or load shedder | $2,229 | $6,000 |
$2,229
-
kWh
|
- | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $8,638 | $4,302 |
$8,638
153,869
kWh
|
- | |
TOTAL RECOMMENDED | $29,357 | $16,396 |
$23,363
376,612
kWh
|
$5,994
-
MMBtu
|
||
TOTAL IMPLEMENTED | $29,357 | $16,396 |
$23,363
376,612
kWh
|
$5,994
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs