ITAC Assessment: ME0210
ITAC logo
ITAC Assessment: ME0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Woolen Greige Goods
NAICS
n/a
SIC 2231: Broadwoven Fabric Mills, Wool (Including Dyeing and Finishing)
Sales Range $1
M
to 5
M
# of Employees 225
Plant Area 140,000
ft2
Annual Production 67,500
thousand feet
Production Hrs. Annual 6,600
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $658,573 9,739,742
kWh
Electricity Demand $216,187 21,029
kW-mo/yr
Electricity Fees $18,596 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,079

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4239: Eliminate or reduce compressed air usage $20,315 $6,070 $20,315
225,967
kWh
- - - -
02 2.3511: Use plant owned transformers or lease transformers $10,587 $19,335 - - - - $10,587
03 2.4133: Use most efficient type of electric motors $7,808 $23,664 $7,672
107,562
kWh
$136
-
kW-mo/yr
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,873 $3,846 $4,873
69,754
kWh
- - - -
05 3.7121: Improve handling practices $2,190 $500 - - - - $2,190
06 2.4221: Install compressor air intakes in coolest locations $2,084 $480 $2,084
29,894
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,148 $2,360 $983
11,723
kWh
$165
-
kW-mo/yr
- - -
08 3.4115: Recover and reuse cooling water $17,389 $6,500 - - $17,389
-
Tgal
- -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $2,080 $10,200 - - - $2,080
-
lb
-
TOTAL RECOMMENDED $68,474 $72,955 $35,927
444,900
kWh
$301
-
kW-mo/yr
$17,389
-
Tgal
$2,080
-
lb
$12,777
TOTAL IMPLEMENTED $46,079 $56,685 $15,612
218,933
kWh
$301
-
kW-mo/yr
$17,389
-
Tgal
- $12,777
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs