ITAC Assessment: ME0203
ITAC logo
ITAC Assessment: ME0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Ice cream sticks
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 80,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,909 1,203,107
kWh
Electricity Demand $23,293 2,745
kW-mo/yr
Electricity Fees $1,141 -
Fuel Oil #4 $15,578 3,592
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,318 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,555

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Solid Waste (non-haz) Savings Water Consumption Savings By-product Production Savings
01 2.4235: Remove or close off unneeded compressed air lines $5,616 $290 $5,616
80,305
kWh
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,536 $21,778 $4,298
61,254
kWh
$1,238
-
kW-mo/yr
- - - -
03 2.4322: Use or replace with energy efficient substitutes $1,575 $3,600 $1,575
22,567
kWh
- - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,182 $600 $1,182
16,999
kWh
- - - - -
05 2.4221: Install compressor air intakes in coolest locations $759 $500 $759
10,844
kWh
- - - - -
06 2.2511: Insulate bare equipment $147 $192 - - $147
-
MMBtu
- - -
07 3.5313: Increase amount of waste recovered for resale $9,374 $4,932 - - - $2,400
-
lb
- $6,974
08 2.2511: Insulate bare equipment $4,129 $1,282 $2,419
34,584
kWh
$407
-
kW-mo/yr
$1,263
-
MMBtu
- $40
-
Tgal
-
TOTAL RECOMMENDED $28,318 $33,174 $15,849
226,553
kWh
$1,645
-
kW-mo/yr
$1,410
-
MMBtu
$2,400
-
lb
$40
-
Tgal
$6,974
TOTAL IMPLEMENTED $22,555 $32,692 $10,233
146,248
kWh
$1,645
-
kW-mo/yr
$1,263
-
MMBtu
$2,400
-
lb
$40
-
Tgal
$6,974
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Solid Waste (non-haz) Savings Water Consumption Savings By-product Production Savings