| Assessment Year | 1996 |
|---|---|
| Principal Product | Tungston Wire Cores |
| NAICS |
n/a
|
| SIC | 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere |
| Sales Range | $10 M to 50M |
| # of Employees | 450 |
| Plant Area |
210,000
ft2
|
| Annual Production | 12,000,000
pieces
|
| Production Hrs. Annual | 7,000
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,757,440 | 26,023,447 |
kWh
|
$0.068 |
| Electricity Demand | $324,749 | 54,534 |
kW-mo/yr
|
$5.95 |
| Electricity Fees | $60,925 | - |
|
- |
| Natural Gas | $348,272 | 61,767 |
MMBtu
|
$5.64 |
| LPG | $167,522 | 32,346 |
MMBtu
|
$5.18 |
| Fuel Oil #2 | $24,768 | 6,090 |
MMBtu
|
$4.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $150,462 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $50,802 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $58,152 | $127,000 | - | - | - | $58,152 | |
| 02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $40,938 | $4,108 |
$40,938
584,994
kWh
|
- | - | - | |
| 03 | 2.6242: Minimize operation of equipment maintained in standby condition | $26,743 | $600 | - | - |
$26,743
-
MMBtu
|
- | |
| 04 | 2.6231: Utilize controls to operate equipment only when needed | $13,452 | $308 | - | - |
$13,452
-
MMBtu
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,440 | $18,689 |
$7,292
105,510
kWh
|
$1,148
-
kW-mo/yr
|
- | - | |
| 06 | 2.2437: Recover waste heat from equipment | $1,521 | $2,761 | - | - |
$1,521
-
MMBtu
|
- | |
| 07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $646 | $1,118 |
$1,067
15,240
kWh
|
- |
$(-421.0)
-
MMBtu
|
- | |
| 08 | 2.2211: Use optimum temperature | $570 | $530 | - | - |
$570
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $150,462 | $155,114 |
$49,297
705,744
kWh
|
$1,148
-
kW-mo/yr
|
$41,865
-
MMBtu
|
$58,152 | ||
| TOTAL IMPLEMENTED | $50,802 | $23,476 |
$8,359
120,750
kWh
|
$1,148
-
kW-mo/yr
|
$41,295
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs