ITAC Assessment: ME0188
ITAC logo
ITAC Assessment: ME0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Tungston Wire Cores
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area 210,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 7,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,757,440 26,023,447
kWh
Electricity Demand $324,749 54,534
kW-mo/yr
Electricity Fees $60,925 -
Natural Gas $348,272 61,767
MMBtu
LPG $167,522 32,346
MMBtu
Fuel Oil #2 $24,768 6,090
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $150,462 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,802

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $58,152 $127,000 - - - $58,152
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $40,938 $4,108 $40,938
584,994
kWh
- - -
03 2.6242: Minimize operation of equipment maintained in standby condition $26,743 $600 - - $26,743
-
MMBtu
-
04 2.6231: Utilize controls to operate equipment only when needed $13,452 $308 - - $13,452
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,440 $18,689 $7,292
105,510
kWh
$1,148
-
kW-mo/yr
- -
06 2.2437: Recover waste heat from equipment $1,521 $2,761 - - $1,521
-
MMBtu
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $646 $1,118 $1,067
15,240
kWh
- $(-421.0)
-
MMBtu
-
08 2.2211: Use optimum temperature $570 $530 - - $570
-
MMBtu
-
TOTAL RECOMMENDED $150,462 $155,114 $49,297
705,744
kWh
$1,148
-
kW-mo/yr
$41,865
-
MMBtu
$58,152
TOTAL IMPLEMENTED $50,802 $23,476 $8,359
120,750
kWh
$1,148
-
kW-mo/yr
$41,295
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs