ITAC Assessment: ME0187
ITAC logo
ITAC Assessment: ME0187
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Sky Lights
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 45,500
ft2
Annual Production 40,000
units
Production Hrs. Annual 2,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,074 1,203,986
kWh
Electricity Demand $75,934 7,884
kW-mo/yr
Electricity Fees $3,054 -
Fuel Oil #6 $36,385 12,326
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,928

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,346 $5,000 $1,523
21,688
kWh
$4,113
-
kW-mo/yr
$(-290.0)
-
MMBtu
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,017 $11,793 $2,823
40,445
kWh
$1,194
-
kW-mo/yr
- - - - -
03 2.2223: Enhance sensitivity of temperature control and cutoff $2,188 $180 $1,086
7,327
kWh
$1,102
-
kW-mo/yr
- - - - -
04 2.2511: Insulate bare equipment $938 $195 $938
13,482
kWh
- - - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $617 $700 $617
8,792
kWh
- - - - - -
06 2.2511: Insulate bare equipment $356 $359 $356
5,275
kWh
- - - - - -
07 2.4221: Install compressor air intakes in coolest locations $345 $800 $345
4,982
kWh
- - - - - -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $14,359 $10,247 - - - - $8,077
-
lb
$6,282 -
09 3.4151: Minimize water usage $4,135 $20,220 - - - $1,734
-
gal
- - $2,401
-
Tgal
TOTAL RECOMMENDED $32,301 $49,494 $7,688
101,991
kWh
$6,409
-
kW-mo/yr
$(-290.0)
-
MMBtu
$1,734
-
gal
$8,077
-
lb
$6,282 $2,401
-
Tgal
TOTAL IMPLEMENTED $27,928 $37,342 $4,509
56,271
kWh
$5,215
-
kW-mo/yr
$(-290.0)
-
MMBtu
$1,734
-
gal
$8,077
-
lb
$6,282 $2,401
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs