Assessment Year | 1996 |
---|---|
Principal Product | bread |
NAICS |
n/a
|
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
275,000
ft2
|
Annual Production | 72,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $535,313 | 5,964,537 |
kWh
|
$0.090 |
Electricity Demand | $124,532 | 22,947 |
kW-mo/yr
|
$5.43 |
Electricity Fees | $16,306 | - |
|
- |
Natural Gas | $336,846 | 68,404 |
MMBtu
|
$4.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,260 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,260 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $12,254 | $2,600 |
$12,254
175,264
kWh
|
- | - | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $7,498 | $5,100 |
$7,498
106,975
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,255 | $1,200 |
$4,255
60,961
kWh
|
- | - | - | |
04 | 2.3212: Optimize plant power factor | $4,144 | $5,290 | - | - | $4,144 | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $2,854 | $1,050 |
$2,854
40,739
kWh
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,128 | $70 |
$1,128
16,120
kWh
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $655 | $1,000 | - |
$655
-
MMBtu
|
- | - | |
08 | 2.2511: Insulate bare equipment | $660 | $1,000 | - |
$660
-
MMBtu
|
- | - | |
09 | 2.2153: Close off unneeded steam lines | $812 | $1,850 | - |
$793
-
MMBtu
|
- |
$19
-
Tgal
|
|
TOTAL RECOMMENDED | $34,260 | $19,160 |
$27,989
400,059
kWh
|
$2,108
-
MMBtu
|
$4,144 |
$19
-
Tgal
|
||
TOTAL IMPLEMENTED | $34,260 | $19,160 |
$27,989
400,059
kWh
|
$2,108
-
MMBtu
|
$4,144 |
$19
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs