ITAC Assessment: KU0462
ITAC logo
ITAC Assessment: KU0462
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Printed Circuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 34,048
ft2
Annual Production 133,000
pieces
Production Hrs. Annual 8,500
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,294 3,080,012
kWh
Electricity Demand $39,237 6,182
kW-mo/yr
Natural Gas $18,153 3,888
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,445 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,052

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.1244: Reduce solution drag-out to prevent solution loss $28,125 $359 - - - $28,125
-
gal
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,852 $312 $6,573
157,093
kWh
$1,279
-
kW-mo/yr
- - - -
03 3.4113: Treat and reuse rinse waters $6,559 $3,041 $(-137.0)
(-3,224)
kWh
$(-29.0)
-
kW-mo/yr
$6,725
-
Tgal
- - -
04 2.7135: Install occupancy sensors $5,219 $1,450 $4,017
96,131
kWh
$1,202
-
kW-mo/yr
- - - -
05 2.4221: Install compressor air intakes in coolest locations $2,755 $205 $2,306
55,100
kWh
$449
-
kW-mo/yr
- - - -
06 2.4133: Use most efficient type of electric motors $1,934 $2,566 $1,548
36,928
kWh
$386
-
kW-mo/yr
- - - -
07 2.4314: Use synthetic lubricant $1,255 $299 $906
21,688
kWh
$179
-
kW-mo/yr
- - - $170
08 2.7142: Utilize higher efficiency lamps and/or ballasts $393 $600 $139
3,224
kWh
$26
-
kW-mo/yr
- - $175 $53
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $353 $42 $274
6,448
kWh
$79
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $54,445 $8,874 $15,626
373,388
kWh
$3,571
-
kW-mo/yr
$6,725
-
Tgal
$28,125
-
gal
$175 $223
TOTAL IMPLEMENTED $54,052 $8,274 $15,487
370,164
kWh
$3,545
-
kW-mo/yr
$6,725
-
Tgal
$28,125
-
gal
- $170
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs