ITAC Assessment: ME0184
ITAC logo
ITAC Assessment: ME0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Millwork
NAICS
n/a
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 59,625
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,512 712,192
kWh
Electricity Demand $18,964 2,328
kW-mo/yr
Electricity Fees $415 -
LPG $10,039 1,319
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,518 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,518

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,017 $11,793 $2,823
40,152
kWh
$1,194
-
kW-mo/yr
- - -
02 2.7241: Install outside air damper / economizer on hvac unit $1,210 $8,250 $1,210
17,292
kWh
- - - -
03 2.2437: Recover waste heat from equipment $1,212 $930 - - $1,212
-
MMBtu
- -
04 2.8121: Apply for tax-free status for energy purchases $1,716 - - - - - $1,716
05 2.8114: Change rate schedules or other changes in utility service $1,068 - - - - - $1,068
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,687 $100 $1,687
24,033
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $449 $1,000 $449
6,448
kWh
- - - -
08 2.4221: Install compressor air intakes in coolest locations $350 $350 $350
7,327
kWh
- - - -
09 2.4239: Eliminate or reduce compressed air usage $209 $100 $209
2,931
kWh
- - - -
10 3.6192: Use a less expensive method of waste removal $1,600 - - - - $1,600
-
lb
-
TOTAL RECOMMENDED $13,518 $22,523 $6,728
98,183
kWh
$1,194
-
kW-mo/yr
$1,212
-
MMBtu
$1,600
-
lb
$2,784
TOTAL IMPLEMENTED $13,518 $22,523 $6,728
98,183
kWh
$1,194
-
kW-mo/yr
$1,212
-
MMBtu
$1,600
-
lb
$2,784
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs