Assessment Year | 1996 |
---|---|
Principal Product | 2'x4'studs |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
44,000
ft2
|
Annual Production | 81,000,000
thousand feet
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $785,102 | 11,031,946 |
kWh
|
$0.071 |
Electricity Demand | $183,369 | 26,528 |
kW-mo/yr
|
$6.91 |
Electricity Fees | $302 | - |
|
- |
LPG | $6,477 | 2,997 |
MMBtu
|
$2.16 |
Fuel Oil #2 | $27,853 | 7,000 |
MMBtu
|
$3.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $82,208 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $64,208 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $23,160 | $1,200 |
$23,160
330,891
kWh
|
- | - | - | - | |
02 | 4.652: Replace existing equipment with more suitable substitutes | $18,000 | $26,280 | - | - | - | - | $18,000 | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,553 | $10,500 |
$8,553
122,216
kWh
|
- | - | - | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $8,809 | - |
$8,809
125,733
kWh
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,901 | $13,040 |
$4,893
70,047
kWh
|
$1,008
-
kW-mo/yr
|
- | - | - | |
06 | 2.4325: Upgrade conveyors | $5,339 | $6,100 |
$4,641
66,237
kWh
|
$698
-
kW-mo/yr
|
- | - | - | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,206 | $6,000 |
$3,732
53,341
kWh
|
$2,379
-
kW-mo/yr
|
$(-905.0)
-
MMBtu
|
- | - | |
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,000 | $9,500 | - | - | - | $3,000 | - | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,133 | - |
$3,133
44,842
kWh
|
- | - | - | - | |
10 | 2.8121: Apply for tax-free status for energy purchases | $1,107 | - | - | - | - | $1,107 | - | |
TOTAL RECOMMENDED | $82,208 | $72,620 |
$56,921
813,307
kWh
|
$4,085
-
kW-mo/yr
|
$(-905.0)
-
MMBtu
|
$4,107 | $18,000 | ||
TOTAL IMPLEMENTED | $64,208 | $46,340 |
$56,921
813,307
kWh
|
$4,085
-
kW-mo/yr
|
$(-905.0)
-
MMBtu
|
$4,107 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs