Assessment Year | 1996 |
---|---|
Principal Product | Shoes |
NAICS |
n/a
|
SIC | 3143: Men's Footwear, Except Athletic |
Sales Range | $10 M to 50M |
# of Employees | 155 |
Plant Area |
31,250
ft2
|
Annual Production | 328,000
pieces
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $45,823 | 655,041 |
kWh
|
$0.070 |
Electricity Demand | $26,951 | 2,148 |
kW-mo/yr
|
$12.55 |
Electricity Fees | $2,281 | - |
|
- |
Fuel Oil #2 | $7,943 | 1,751 |
MMBtu
|
$4.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,754 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,974 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,845 | $10,000 |
$2,620
37,222
kWh
|
$4,579
-
kW-mo/yr
|
$(-1,354.0)
-
MMBtu
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,749 | $5,000 |
$1,575
22,274
kWh
|
$636
-
kW-mo/yr
|
- |
$(-462.0)
-
MMBtu
|
|
03 | 2.2136: Install / repair insulation on steam lines | $1,186 | $600 | - | - | - |
$1,186
-
MMBtu
|
|
04 | 2.2511: Insulate bare equipment | $835 | $371 |
$835
12,016
kWh
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $754 | $300 |
$754
8,499
kWh
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $385 | $750 |
$385
5,569
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $10,754 | $17,021 |
$6,169
85,580
kWh
|
$5,215
-
kW-mo/yr
|
$(-1,354.0)
-
MMBtu
|
$724
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,974 | $1,421 |
$1,974
26,084
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs