Assessment Year | 1995 |
---|---|
Principal Product | Carbonated Beverages |
NAICS |
n/a
|
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
161,000
ft2
|
Annual Production | 3,400,000
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $214,215 | 1,754,396 |
kWh
|
$0.12 |
Fuel Oil #4 | $40,319 | 13,237 |
MMBtu
|
$3.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,492 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,879 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #4 Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $2,666 | $8,090 |
$2,666
19,637
kWh
|
- | - | - | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,372 | $5,406 |
$2,623
38,394
kWh
|
$(-251.0)
-
MMBtu
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $993 | $200 |
$993
28,429
kWh
|
- | - | - | - | |
04 | 2.8121: Apply for tax-free status for energy purchases | $785 | - | - | - | - | - | $785 | |
05 | 2.1213: Direct warmest air to combustion intake | $196 | $400 | - |
$196
-
MMBtu
|
- | - | - | |
06 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $439 | $1,135 |
$439
6,155
kWh
|
- | - | - | - | |
07 | 2.6218: Turn off equipment when not in use | $410 | - |
$410
4,689
kWh
|
- | - | - | - | |
08 | 2.8118: Check for accuracy of utility / power meters | $15,905 | - | - | - | - | - | $15,905 | |
09 | 3.4114: Replace city water with recycled water via cooling tower | $6,875 | $30,000 | - | - |
$6,875
-
Tgal
|
- | - | |
10 | 3.5142: Treat and reuse equipment cleaning solutions | $1,851 | $233 | - | - |
$39
-
Tgal
|
$1,812
-
gal
|
- | |
TOTAL RECOMMENDED | $32,492 | $45,464 |
$7,131
97,304
kWh
|
$(-55.0)
-
MMBtu
|
$6,914
-
Tgal
|
$1,812
-
gal
|
$16,690 | ||
TOTAL IMPLEMENTED | $17,879 | $600 |
$993
28,429
kWh
|
$196
-
MMBtu
|
- | - | $16,690 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #4 Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs