ITAC Assessment: ME0172
ITAC logo
ITAC Assessment: ME0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Oriented Strand Board
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 55,652
ft2
Annual Production 1,960,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,608,501 25,347,304
kWh
LPG $22,655 3,584
MMBtu
Fuel Oil #2 $106,409 13,059
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,716

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,130 $600 $19,130
260,844
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $12,895 $900 $12,895
215,123
kWh
-
03 2.4239: Eliminate or reduce compressed air usage $11,141 $2,140 $11,141
183,177
kWh
-
04 2.8114: Change rate schedules or other changes in utility service $10,356 $5,000 - $10,356
05 2.4239: Eliminate or reduce compressed air usage $4,680 $1,600 $4,680
77,960
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $822 $1,540 $822
13,482
kWh
-
07 2.4239: Eliminate or reduce compressed air usage $445 $820 $445
8,206
kWh
-
TOTAL RECOMMENDED $59,469 $12,600 $49,113
758,792
kWh
$10,356
TOTAL IMPLEMENTED $30,716 $3,560 $30,716
452,227
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs