ITAC Assessment: OR0722
ITAC logo
ITAC Assessment: OR0722
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Modular Buildings
NAICS 321992: Prefabricated Wood Building Manufacturing
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 181
Plant Area 150,000
ft2
Annual Production 300,000
units
Production Hrs. Annual 2,210
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,346 789,640
kWh
Electricity Demand $19,838 3,323
kW-mo/yr
Electricity Fees $11,463 -
Natural Gas $36,393 4,576
MMBtu
LPG $11,379 663
MMBtu
Waste Disposal Costs
Water Usage $2,697 447
Tgal
Other Liquid (non-haz) $178,750 6,500
gal
TOTAL YEARLY COSTS $315,866
RECOMMENDED SAVINGS* $115,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,029

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.131: Modify process to reduce material use/cost $42,047 $1,000 - - - - $447
-
gal
$41,600 -
02 4.431: Train operators for maximum operating efficiency $17,875 - - - - - $17,875
-
gal
- -
03 2.2211: Use optimum temperature $6,191 - - - $6,191
-
MMBtu
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,107 - $7,201
102,508
kWh
$906
-
kW-mo/yr
- - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,488 $1,110 $1,034
14,725
kWh
$454
-
kW-mo/yr
- - - - -
06 2.8227: Adjust / maintain fork lift trucks for most efficient operation $28,751 $129,960 $(-4,932.0)
(-70,200)
kWh
- - $10,733
-
MMBtu
- $22,950 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $10,941 $15,179 $6,986
94,932
kWh
$3,011
-
kW-mo/yr
- - - $798 $146
TOTAL RECOMMENDED $115,400 $147,249 $10,289
141,965
kWh
$4,371
-
kW-mo/yr
$6,191
-
MMBtu
$10,733
-
MMBtu
$18,322
-
gal
$65,348 $146
TOTAL IMPLEMENTED $68,029 $1,000 $7,201
102,508
kWh
$906
-
kW-mo/yr
- - $18,322
-
gal
$41,600 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs