| Assessment Year | 2019 |
|---|---|
| Principal Product | Modular Buildings |
| NAICS | 321992: Prefabricated Wood Building Manufacturing |
| SIC | 2452: Prefabricated Wood Buildings and Components |
| Sales Range | $10 M to 50M |
| # of Employees | 181 |
| Plant Area |
150,000
ft2
|
| Annual Production | 300,000
units
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $55,346 | 789,640 |
kWh
|
$0.070 | |
| Electricity Demand | $19,838 | 3,323 |
kW-mo/yr
|
$5.97 | |
| Electricity Fees | $11,463 | - |
|
- | |
| Natural Gas | $36,393 | 4,576 |
MMBtu
|
$7.95 | |
| LPG | $11,379 | 663 |
MMBtu
|
$17.16 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,697 | 447 |
Tgal
|
$6.03 | |
| Other Liquid (non-haz) | $178,750 | 6,500 |
gal
|
$27.50 | |
| TOTAL YEARLY COSTS | $315,866 | ||||
| RECOMMENDED SAVINGS* | $115,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $68,029 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.131: Modify process to reduce material use/cost | $42,047 | $1,000 | - | - | - | - |
$447
-
gal
|
$41,600 | - | |
| 02 | 4.431: Train operators for maximum operating efficiency | $17,875 | - | - | - | - | - |
$17,875
-
gal
|
- | - | |
| 03 | 2.2211: Use optimum temperature | $6,191 | - | - | - |
$6,191
-
MMBtu
|
- | - | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,107 | - |
$7,201
102,508
kWh
|
$906
-
kW-mo/yr
|
- | - | - | - | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,488 | $1,110 |
$1,034
14,725
kWh
|
$454
-
kW-mo/yr
|
- | - | - | - | - | |
| 06 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $28,751 | $129,960 |
$(-4,932.0)
(-70,200)
kWh
|
- | - |
$10,733
-
MMBtu
|
- | $22,950 | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,941 | $15,179 |
$6,986
94,932
kWh
|
$3,011
-
kW-mo/yr
|
- | - | - | $798 | $146 | |
| TOTAL RECOMMENDED | $115,400 | $147,249 |
$10,289
141,965
kWh
|
$4,371
-
kW-mo/yr
|
$6,191
-
MMBtu
|
$10,733
-
MMBtu
|
$18,322
-
gal
|
$65,348 | $146 | ||
| TOTAL IMPLEMENTED | $68,029 | $1,000 |
$7,201
102,508
kWh
|
$906
-
kW-mo/yr
|
- | - |
$18,322
-
gal
|
$41,600 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs