Assessment Year | 1995 |
---|---|
Principal Product | insulation board |
NAICS |
n/a
|
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
87,000
ft2
|
Annual Production | 69,732,000
thousand feet
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $187,855 | 1,936,694 |
kWh
|
$0.097 |
LPG | $19,895 | 2,800 |
MMBtu
|
$7.11 |
Fuel Oil #2 | $7,883 | 1,685 |
MMBtu
|
$4.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,611 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,641 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings | Water Disposal Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $23,325 | $55,000 |
$18,128
201,348
kWh
|
$5,197
-
MMBtu
|
- | - | - | |
02 | 2.2437: Recover waste heat from equipment | $15,977 | $6,730 |
$14,250
146,835
kWh
|
- |
$1,727
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,002 | $8,064 |
$11,002
146,249
kWh
|
- | - | - | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,232 | $8,000 |
$4,695
102,579
kWh
|
$(-463.0)
-
MMBtu
|
- | - | - | |
05 | 2.2531: Re-size charging openings or add movable cover or door | $2,200 | - | - |
$2,200
-
MMBtu
|
- | - | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,736 | $5,000 |
$1,903
46,893
kWh
|
$(-167.0)
-
MMBtu
|
- | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $290 | $200 |
$290
4,103
kWh
|
- | - | - | - | |
08 | 3.4151: Minimize water usage | $849 | $110 | - | - | - |
$325
-
Tgal
|
$524
-
Tgal
|
|
TOTAL RECOMMENDED | $59,611 | $83,104 |
$50,268
648,007
kWh
|
$6,767
-
MMBtu
|
$1,727
-
MMBtu
|
$325
-
Tgal
|
$524
-
Tgal
|
||
TOTAL IMPLEMENTED | $42,641 | $62,040 |
$32,668
352,286
kWh
|
$7,397
-
MMBtu
|
$1,727
-
MMBtu
|
$325
-
Tgal
|
$524
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings | Water Disposal Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs