ITAC Assessment: ME0170
ITAC logo
ITAC Assessment: ME0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product insulation board
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 87,000
ft2
Annual Production 69,732,000
thousand feet
Production Hrs. Annual 5,760
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,855 1,936,694
kWh
LPG $19,895 2,800
MMBtu
Fuel Oil #2 $7,883 1,685
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,611 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,641

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #2 Savings Water Disposal Savings Water Consumption Savings
01 2.4322: Use or replace with energy efficient substitutes $23,325 $55,000 $18,128
201,348
kWh
$5,197
-
MMBtu
- - -
02 2.2437: Recover waste heat from equipment $15,977 $6,730 $14,250
146,835
kWh
- $1,727
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,002 $8,064 $11,002
146,249
kWh
- - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,232 $8,000 $4,695
102,579
kWh
$(-463.0)
-
MMBtu
- - -
05 2.2531: Re-size charging openings or add movable cover or door $2,200 - - $2,200
-
MMBtu
- - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,736 $5,000 $1,903
46,893
kWh
$(-167.0)
-
MMBtu
- - -
07 2.4221: Install compressor air intakes in coolest locations $290 $200 $290
4,103
kWh
- - - -
08 3.4151: Minimize water usage $849 $110 - - - $325
-
Tgal
$524
-
Tgal
TOTAL RECOMMENDED $59,611 $83,104 $50,268
648,007
kWh
$6,767
-
MMBtu
$1,727
-
MMBtu
$325
-
Tgal
$524
-
Tgal
TOTAL IMPLEMENTED $42,641 $62,040 $32,668
352,286
kWh
$7,397
-
MMBtu
$1,727
-
MMBtu
$325
-
Tgal
$524
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Fuel Oil #2 Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs