ITAC Assessment: ME0166
ITAC logo
ITAC Assessment: ME0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Firearms, human restraints
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 36,000
ft2
Annual Production 290,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,237 1,616,940
kWh
Fuel Oil #2 $4,011 746
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,684 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,119

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,304 $43,147 $15,304
216,589
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,696 $600 $4,696
76,202
kWh
- - -
03 2.2511: Insulate bare equipment $789 $600 $789
11,430
kWh
- - -
04 2.8121: Apply for tax-free status for energy purchases $645 - - - $645 -
05 2.4221: Install compressor air intakes in coolest locations $474 $200 $474
6,741
kWh
- - -
06 2.7135: Install occupancy sensors $509 $1,800 $509
7,034
kWh
- - -
07 3.4115: Recover and reuse cooling water $1,239 $2,650 - $851
-
Tgal
- $388
-
Tgal
08 3.4151: Minimize water usage $1,028 $570 - $560
-
Tgal
- $468
-
Tgal
TOTAL RECOMMENDED $24,684 $49,567 $21,772
317,996
kWh
$1,411
-
Tgal
$645 $856
-
Tgal
TOTAL IMPLEMENTED $21,119 $43,947 $20,474
299,532
kWh
- $645 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs