ITAC Assessment: OR0208
ITAC logo
ITAC Assessment: OR0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product bacon, ham, sausages
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 61,500
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,039 3,293,083
kWh
Natural Gas $54,629 16,325
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $288 $500 - $288
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,662 $6,842 $3,662
79,719
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,604 $3,634 $1,604
35,170
kWh
-
04 2.4133: Use most efficient type of electric motors $588 $1,470 $588
13,482
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,373 $18,725 $3,373
75,909
kWh
-
06 2.2621: Modify refrigeration system to operate at a lower pressure $1,482 - $1,482
39,566
kWh
-
TOTAL RECOMMENDED $10,997 $31,171 $10,709
243,846
kWh
$288
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs