| Assessment Year | 1995 |
|---|---|
| Principal Product | Automotive Parts |
| NAICS |
n/a
|
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
24,500
ft2
|
| Annual Production | 2,400,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $85,064 | 872,802 |
kWh
|
$0.097 |
| LPG | $4,544 | 821 |
MMBtu
|
$5.53 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,014 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,472 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.8121: Apply for tax-free status for energy purchases | $1,205 | - | - | - | - | $1,205 | - | |
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,078 | - |
$1,078
10,844
kWh
|
- | - | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $937 | $600 |
$937
13,482
kWh
|
- | - | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $901 | $600 |
$901
8,792
kWh
|
- | - | - | - | |
| 05 | 2.6125: Keep equipment clean | $728 | $300 |
$728
7,327
kWh
|
- | - | - | - | |
| 06 | 2.2515: Use optimum thickness insulation | $527 | $145 |
$527
5,275
kWh
|
- | - | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $294 | $515 |
$294
2,931
kWh
|
- | - | - | - | |
| 08 | 3.3132: Use reverse osmosis to concentrate material | $7,418 | $4,000 | - |
$7,418
-
gal
|
- | - | - | |
| 09 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $5,904 | $10,025 | - | - |
$5,904
-
lb
|
- | - | |
| 10 | 3.4151: Minimize water usage | $1,022 | $75 |
$810
8,206
kWh
|
- | - | - |
$212
-
Tgal
|
|
| TOTAL RECOMMENDED | $20,014 | $16,260 |
$5,275
56,857
kWh
|
$7,418
-
gal
|
$5,904
-
lb
|
$1,205 |
$212
-
Tgal
|
||
| TOTAL IMPLEMENTED | $17,472 | $15,515 |
$2,733
27,256
kWh
|
$7,418
-
gal
|
$5,904
-
lb
|
$1,205 |
$212
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs