ITAC Assessment: LL0119
ITAC logo
ITAC Assessment: LL0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Steel castings
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 212,000
ft2
Annual Production 4,800
ton
Production Hrs. Annual 2,400
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $701,322 10,284,101
kWh
Electricity Demand $289,201 141,573
kW-mo/yr
Electricity Fees $10,583 -
Natural Gas $782,501 163,670
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $156,456 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $111,785

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $22,921 $4,950 $22,039
323,917
kWh
- $882 - -
02 2.2511: Insulate bare equipment $36,284 $19,204 - - - $36,284
-
MMBtu
-
03 2.7145: Install skylights $8,387 $13,894 $6,448
132,000
kWh
$1,616
-
kW-mo/yr
$323 - -
04 2.3212: Optimize plant power factor $45,054 $173,974 - $43,321
-
kW-mo/yr
$1,733 - -
05 3.5313: Increase amount of waste recovered for resale $43,810 - - - - - $43,810
-
lb
TOTAL RECOMMENDED $156,456 $212,022 $28,487
455,917
kWh
$44,937
-
kW-mo/yr
$2,938 $36,284
-
MMBtu
$43,810
-
lb
TOTAL IMPLEMENTED $111,785 $178,924 $22,039
323,917
kWh
$43,321
-
kW-mo/yr
$2,615 - $43,810
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs