ITAC Assessment: MS0385
ITAC logo
ITAC Assessment: MS0385
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Preserved wood poles
NAICS 321114: Wood Preservation
SIC 2491: Wood Preserving
Sales Range $5
M
to 10
M
# of Employees 32
Plant Area 1,524,600
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,624 1,362,040
kWh
Electricity Demand $66,279 6,442
kW-mo/yr
Electricity Fees $5,346 -
LPG $2,662 114
MMBtu
Wood $1 64,233
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,279 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings
01 2.2414: Use waste heat from hot flue gases to preheat $1,422 $5,076 - - - $1,422
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,574 $14,352 $3,948
51,275
kWh
$2,541
-
kW-mo/yr
$85 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,570 $351 $3,548
46,082
kWh
- $22 -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $521 $670 $225
2,930
kWh
$288
-
kW-mo/yr
$8 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $192 $470 $100
1,299
kWh
$90
-
kW-mo/yr
$2 -
TOTAL RECOMMENDED $12,279 $20,919 $7,821
101,586
kWh
$2,919
-
kW-mo/yr
$117 $1,422
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs