ITAC Assessment: ME0163
ITAC logo
ITAC Assessment: ME0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Newspapers
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 620
Plant Area 105,000
ft2
Annual Production 19,760,000
pieces
Production Hrs. Annual 5,824
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $491,825 5,730,657
kWh
Natural Gas $73,522 11,464
MMBtu
Fuel Oil #4 $25,423 7,215
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,889 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $31,832 $100,681 $31,832
530,774
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $3,583 $3,140 $3,583
48,066
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $975 $1,640 $1,059
14,947
kWh
$(-84.0)
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,213 $2,550 $1,237
14,947
kWh
$(-24.0)
-
MMBtu
05 2.7134: Use photocell controls $765 $400 $765
9,379
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $521 $500 $521
6,448
kWh
-
TOTAL RECOMMENDED $38,889 $108,911 $38,997
624,561
kWh
$(-108.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs