ITAC Assessment: ME0155
ITAC logo
ITAC Assessment: ME0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product TEXTILES
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 58,300
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,561 1,133,353
kWh
LPG $7,137 858
MMBtu
Fuel Oil #2 $8,581 1,729
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,752 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,752

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,097 $20,385 $15,097
165,299
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $12,904 $20,000 $12,424
126,026
kWh
$480
-
MMBtu
-
03 2.2153: Close off unneeded steam lines $1,120 $200 - - $1,120
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $952 $350 - - $952
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $907 $400 - - $907
-
MMBtu
06 2.2515: Use optimum thickness insulation $772 $130 $772
7,327
kWh
- -
TOTAL RECOMMENDED $31,752 $41,465 $28,293
298,652
kWh
$480
-
MMBtu
$2,979
-
MMBtu
TOTAL IMPLEMENTED $31,752 $41,465 $28,293
298,652
kWh
$480
-
MMBtu
$2,979
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs