Assessment Year | 1995 |
---|---|
Principal Product | Electrical Components |
NAICS |
n/a
|
SIC | 3669: Communications Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 500 |
Plant Area |
195,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,800
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $307,485 | 3,411,196 |
kWh
|
$0.090 |
LPG | $25,961 | 3,528 |
MMBtu
|
$7.36 |
Fuel Oil #6 | $27,237 | 8,230 |
MMBtu
|
$3.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $66,990 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,688 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,033 | $32,229 |
$18,033
199,297
kWh
|
- | - | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,450 | $750 |
$2,450
25,498
kWh
|
- | - | - | - | - | |
03 | 2.8121: Apply for tax-free status for energy purchases | $1,432 | - | - | - | - | $1,432 | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $899 | $1,350 |
$899
49,238
kWh
|
- | - | - | - | - | |
05 | 2.7135: Install occupancy sensors | $650 | $300 |
$650
7,327
kWh
|
- | - | - | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $580 | $300 |
$580
6,448
kWh
|
- | - | - | - | - | |
07 | 3.4114: Replace city water with recycled water via cooling tower | $22,220 | $30,000 | - |
$16,632
-
Tgal
|
- | - |
$5,588
-
Tgal
|
- | |
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $13,800 | $10,000 | - | - |
$9,000
-
lb
|
- | - | $4,800 | |
09 | 3.5316: Contract a wood pallet recycling company | $6,000 | - | - | - |
$6,000
-
lb
|
- | - | - | |
10 | 3.4154: Eliminate leaks in water lines and valves | $926 | $50 | - |
$690
-
Tgal
|
- | - |
$236
-
Tgal
|
- | |
TOTAL RECOMMENDED | $66,990 | $74,979 |
$22,612
287,808
kWh
|
$17,322
-
Tgal
|
$15,000
-
lb
|
$1,432 |
$5,824
-
Tgal
|
$4,800 | ||
TOTAL IMPLEMENTED | $36,688 | $44,679 |
$21,962
280,481
kWh
|
$690
-
Tgal
|
$9,000
-
lb
|
- |
$236
-
Tgal
|
$4,800 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs