Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Electrical Components
NAICS
n/a
SIC 3669: Communications Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 195,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,800
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $307,485 3,411,196
kWh
LPG $25,961 3,528
MMBtu
Fuel Oil #6 $27,237 8,230
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,990 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,688

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,033 $32,229 $18,033
199,297
kWh
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,450 $750 $2,450
25,498
kWh
- - - - -
03 2.8121: Apply for tax-free status for energy purchases $1,432 - - - - $1,432 - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $899 $1,350 $899
49,238
kWh
- - - - -
05 2.7135: Install occupancy sensors $650 $300 $650
7,327
kWh
- - - - -
06 2.4221: Install compressor air intakes in coolest locations $580 $300 $580
6,448
kWh
- - - - -
07 3.4114: Replace city water with recycled water via cooling tower $22,220 $30,000 - $16,632
-
Tgal
- - $5,588
-
Tgal
-
08 3.5315: Lease / purchase baler; sell cardboard to recycler $13,800 $10,000 - - $9,000
-
lb
- - $4,800
09 3.5316: Contract a wood pallet recycling company $6,000 - - - $6,000
-
lb
- - -
10 3.4154: Eliminate leaks in water lines and valves $926 $50 - $690
-
Tgal
- - $236
-
Tgal
-
TOTAL RECOMMENDED $66,990 $74,979 $22,612
287,808
kWh
$17,322
-
Tgal
$15,000
-
lb
$1,432 $5,824
-
Tgal
$4,800
TOTAL IMPLEMENTED $36,688 $44,679 $21,962
280,481
kWh
$690
-
Tgal
$9,000
-
lb
- $236
-
Tgal
$4,800
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings By-product Production Savings