| Assessment Year | 1995 |
|---|---|
| Principal Product | Printed Products |
| NAICS |
n/a
|
| SIC | 2761: Manifold Business Forms |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
125,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,032
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $264,584 | 2,988,277 |
kWh
|
$0.089 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $81,585 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $30,399 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $45,645 | $200,000 |
$63,770
722,743
kWh
|
$(-18,125.0)
-
MMBtu
|
- | |
| 02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $16,145 | $19,000 |
$16,145
251,759
kWh
|
- | - | |
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,843 | $3,940 |
$5,843
66,237
kWh
|
- | - | |
| 04 | 2.7135: Install occupancy sensors | $5,223 | $600 |
$5,223
59,203
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,011 | $300 |
$1,011
11,723
kWh
|
- | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $318 | $825 |
$318
5,569
kWh
|
- | - | |
| 07 | 3.5121: Recycle waste ink and cleanup solvent | $7,400 | - | - | - |
$7,400
-
gal
|
|
| TOTAL RECOMMENDED | $81,585 | $224,665 |
$92,310
1,117,234
kWh
|
$(-18,125.0)
-
MMBtu
|
$7,400
-
gal
|
||
| TOTAL IMPLEMENTED | $30,399 | $23,240 |
$22,999
329,719
kWh
|
- |
$7,400
-
gal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs