ITAC Assessment: MZ0229
ITAC logo
ITAC Assessment: MZ0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product canned aerosols and liquids
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $100
M
to 500
M
# of Employees 525
Plant Area 400,000
ft2
Annual Production 165,000,000
units
Production Hrs. Annual 7,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $510,961 8,640,768
kWh
Electricity Demand $140,851 16,656
kW-mo/yr
Natural Gas $255,778 97,434
MMBtu
Waste Disposal Costs
Water Usage $70,941 14,660,700
Tgal
TOTAL YEARLY COSTS $978,532
RECOMMENDED SAVINGS* $277,884 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $20,644 $27,718 $16,125
273,312
kWh
$3,854
-
kW-mo/yr
- $665
02 2.7142: Utilize higher efficiency lamps and/or ballasts $23,200 $112,088 $17,587
298,080
kWh
$4,213
-
kW-mo/yr
- $1,400
03 2.7144: Install spectral reflectors / delamp $6,600 $1,357 $5,327
90,288
kWh
$1,273
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $790 - $790
13,392
kWh
- - -
05 2.2437: Recover waste heat from equipment $5,119 $550 - - $5,119
-
MMBtu
-
06 2.1224: Replace boiler $183,230 $38,385 - - $183,230
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,499 $10,775 $1,717
29,106
kWh
$782
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $1,053 $420 $775
13,128
kWh
$278
-
kW-mo/yr
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,449 $50 $1,164
19,737
kWh
$285
-
kW-mo/yr
- -
10 2.4133: Use most efficient type of electric motors $33,300 $150,000 $33,300
445,100
kWh
- - -
TOTAL RECOMMENDED $277,884 $341,343 $76,785
1,182,143
kWh
$10,685
-
kW-mo/yr
$188,349
-
MMBtu
$2,065
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs