| Assessment Year | 2017 |
|---|---|
| Principal Product | canned aerosols and liquids |
| NAICS | 332431: Metal Can Manufacturing |
| SIC | 3411: Metal Cans |
| Sales Range | $100 M to 500M |
| # of Employees | 525 |
| Plant Area |
400,000
ft2
|
| Annual Production | 165,000,000
units
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $510,961 | 8,640,768 |
kWh
|
$0.059 | |
| Electricity Demand | $140,851 | 16,656 |
kW-mo/yr
|
$8.46 | |
| Natural Gas | $255,778 | 97,434 |
MMBtu
|
$2.63 | |
| Waste Disposal Costs | |||||
| Water Usage | $70,941 | 14,660,700 |
Tgal
|
$0.005 | |
| TOTAL YEARLY COSTS | $978,532 | ||||
| RECOMMENDED SAVINGS* | $277,884 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,644 | $27,718 |
$16,125
273,312
kWh
|
$3,854
-
kW-mo/yr
|
- | $665 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,200 | $112,088 |
$17,587
298,080
kWh
|
$4,213
-
kW-mo/yr
|
- | $1,400 | |
| 03 | 2.7144: Install spectral reflectors / delamp | $6,600 | $1,357 |
$5,327
90,288
kWh
|
$1,273
-
kW-mo/yr
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $790 | - |
$790
13,392
kWh
|
- | - | - | |
| 05 | 2.2437: Recover waste heat from equipment | $5,119 | $550 | - | - |
$5,119
-
MMBtu
|
- | |
| 06 | 2.1224: Replace boiler | $183,230 | $38,385 | - | - |
$183,230
-
MMBtu
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,499 | $10,775 |
$1,717
29,106
kWh
|
$782
-
kW-mo/yr
|
- | - | |
| 08 | 2.7135: Install occupancy sensors | $1,053 | $420 |
$775
13,128
kWh
|
$278
-
kW-mo/yr
|
- | - | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,449 | $50 |
$1,164
19,737
kWh
|
$285
-
kW-mo/yr
|
- | - | |
| 10 | 2.4133: Use most efficient type of electric motors | $33,300 | $150,000 |
$33,300
445,100
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $277,884 | $341,343 |
$76,785
1,182,143
kWh
|
$10,685
-
kW-mo/yr
|
$188,349
-
MMBtu
|
$2,065 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs