ITAC Assessment: ME0141
ITAC logo
ITAC Assessment: ME0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Pastery Products
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $5
M
to 10
M
# of Employees 139
Plant Area 60,000
ft2
Annual Production 4,420,000
lb
Production Hrs. Annual 4,680
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,975 1,984,174
kWh
LPG $57,874 9,831
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,978 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,839

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.3511: Use plant owned transformers or lease transformers $4,492 $14,000 $4,492
50,117
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,764 $2,080 $2,764
30,774
kWh
-
03 2.1116: Improve combustion control capability $1,896 $660 - $1,896
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $1,292 - $1,292
14,361
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $619 $400 - $619
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $987 $250 $987
11,137
kWh
-
07 2.7233: Use properly designed and sized hvac equipment $2,764 $2,150 - $2,764
-
MMBtu
08 2.2135: Repair and eliminate steam leaks $164 $70 - $164
-
MMBtu
TOTAL RECOMMENDED $14,978 $19,610 $9,535
106,389
kWh
$5,443
-
MMBtu
TOTAL IMPLEMENTED $4,839 $2,550 $4,056
45,135
kWh
$783
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs