ITAC Assessment: KU0193
ITAC logo
ITAC Assessment: KU0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product ACOUSTIC PANELS
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 218,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,327 449,004
kWh
Natural Gas $19,571 4,207
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,377

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,876 $5,003 $3,876
38,394
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $769 $100 $769
7,620
kWh
- -
03 2.7261: Install timers and/or thermostats $4,524 $667 - $4,524
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $273 - - $423
-
MMBtu
$(-150.0)
05 2.1123: Install automatic stack damper $1,097 $500 - $1,097
-
MMBtu
-
06 2.6212: Turn off equipment during breaks, reduce operating time $802 $52 $207
2,052
kWh
$595
-
MMBtu
-
07 2.6212: Turn off equipment during breaks, reduce operating time $178 $75 $178
1,758
kWh
- -
08 2.6121: Reduce hot water temperature to the minimum required $111 - - $111
-
MMBtu
-
TOTAL RECOMMENDED $11,630 $6,397 $5,030
49,824
kWh
$6,750
-
MMBtu
$(-150.0)
TOTAL IMPLEMENTED $10,377 $6,270 $4,645
46,014
kWh
$5,732
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs