Assessment Year | 1986 |
---|---|
Principal Product | ACOUSTIC PANELS |
NAICS |
n/a
|
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
n/a
|
Annual Production | 218,000
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $45,327 | 449,004 |
kWh
|
$0.10 |
Natural Gas | $19,571 | 4,207 |
MMBtu
|
$4.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,630 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,377 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,876 | $5,003 |
$3,876
38,394
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $769 | $100 |
$769
7,620
kWh
|
- | - | |
03 | 2.7261: Install timers and/or thermostats | $4,524 | $667 | - |
$4,524
-
MMBtu
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $273 | - | - |
$423
-
MMBtu
|
$(-150.0) | |
05 | 2.1123: Install automatic stack damper | $1,097 | $500 | - |
$1,097
-
MMBtu
|
- | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $802 | $52 |
$207
2,052
kWh
|
$595
-
MMBtu
|
- | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $178 | $75 |
$178
1,758
kWh
|
- | - | |
08 | 2.6121: Reduce hot water temperature to the minimum required | $111 | - | - |
$111
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $11,630 | $6,397 |
$5,030
49,824
kWh
|
$6,750
-
MMBtu
|
$(-150.0) | ||
TOTAL IMPLEMENTED | $10,377 | $6,270 |
$4,645
46,014
kWh
|
$5,732
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs