ITAC Assessment: DS0004
ITAC logo
ITAC Assessment: DS0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Turkey Feed Pellets
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 65,600
ft2
Annual Production 375,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $300,310 6,241,501
kWh
Natural Gas $111,611 41,722
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $208,663 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,702

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,193 $1,791 $1,193
24,326
kWh
-
02 2.4133: Use most efficient type of electric motors $7,387 $20,751 $7,387
171,747
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $415 $144 $415
12,603
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,246 $3,479 $1,246
38,101
kWh
-
05 2.6218: Turn off equipment when not in use $1,636 $400 $1,636
50,117
kWh
-
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $184,881 $2,000,000 $184,881
2,294,842
kWh
-
07 2.2136: Install / repair insulation on steam lines $2,120 $553 - $2,120
-
MMBtu
08 2.2511: Insulate bare equipment $1,573 $520 - $1,573
-
MMBtu
09 2.2711: Utilize outside air instead of conditioned air for drying $8,212 $16,424 $4,642
94,666
kWh
$3,570
-
MMBtu
TOTAL RECOMMENDED $208,663 $2,044,062 $201,400
2,686,402
kWh
$7,263
-
MMBtu
TOTAL IMPLEMENTED $12,702 $22,238 $9,132
219,813
kWh
$3,570
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs