Assessment Year | 1994 |
---|---|
Principal Product | Turkey Feed Pellets |
NAICS |
n/a
|
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $50 M to 100M |
# of Employees | 125 |
Plant Area |
65,600
ft2
|
Annual Production | 375,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $300,310 | 6,241,501 |
kWh
|
$0.048 |
Natural Gas | $111,611 | 41,722 |
MMBtu
|
$2.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $208,663 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,702 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,193 | $1,791 |
$1,193
24,326
kWh
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $7,387 | $20,751 |
$7,387
171,747
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $415 | $144 |
$415
12,603
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,246 | $3,479 |
$1,246
38,101
kWh
|
- | |
05 | 2.6218: Turn off equipment when not in use | $1,636 | $400 |
$1,636
50,117
kWh
|
- | |
06 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $184,881 | $2,000,000 |
$184,881
2,294,842
kWh
|
- | |
07 | 2.2136: Install / repair insulation on steam lines | $2,120 | $553 | - |
$2,120
-
MMBtu
|
|
08 | 2.2511: Insulate bare equipment | $1,573 | $520 | - |
$1,573
-
MMBtu
|
|
09 | 2.2711: Utilize outside air instead of conditioned air for drying | $8,212 | $16,424 |
$4,642
94,666
kWh
|
$3,570
-
MMBtu
|
|
TOTAL RECOMMENDED | $208,663 | $2,044,062 |
$201,400
2,686,402
kWh
|
$7,263
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,702 | $22,238 |
$9,132
219,813
kWh
|
$3,570
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs