ITAC Assessment: ME0139
ITAC logo
ITAC Assessment: ME0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Sawn Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $1
M
to 5
M
# of Employees 26
Plant Area 130,680
ft2
Annual Production 4,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,227 301,290
kWh
LPG $2,870 237
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,464 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,467

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $56,050 $77,000 - - $56,050
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,810 $4,800 $5,622
35,170
kWh
$(-1,812.0)
-
MMBtu
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $745 $1,000 - $745
-
MMBtu
-
04 2.7135: Install occupancy sensors $430 $250 $430
2,638
kWh
- -
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $880 $1,040 $880
5,275
kWh
- -
06 2.4322: Use or replace with energy efficient substitutes $3,132 $1,760 $3,132
19,050
kWh
- -
07 2.8123: Pay utility bills on time $1,417 - - - $1,417
TOTAL RECOMMENDED $66,464 $85,850 $10,064
62,133
kWh
$(-1,067.0)
-
MMBtu
$57,467
TOTAL IMPLEMENTED $57,467 $77,000 - - $57,467
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs