ITAC Assessment: OD0052
ITAC logo
ITAC Assessment: OD0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Bleach
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 60,000
ft2
Annual Production 5,000
Tgal
Production Hrs. Annual 2,340
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,307 790,445
kWh
Electricity Demand $15,794 3,416
kW-mo/yr
Electricity Fees $12,804 -
Natural Gas $541 60
MMBtu
LPG $1,860 200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,052

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,052 $1,600 $5,696
99,355
kWh
$2,356
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $507 $1,624 $392
4,982
kWh
$115
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $978 $1,041 $692
12,016
kWh
$286
-
kW-mo/yr
-
04 3.5248: Separate and recycle scrap metal to foundry or for sale $209 - - - $209
-
lb
TOTAL RECOMMENDED $9,746 $4,265 $6,780
116,353
kWh
$2,757
-
kW-mo/yr
$209
-
lb
TOTAL IMPLEMENTED $8,052 $1,600 $5,696
99,355
kWh
$2,356
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs