ITAC Assessment: ME0130
ITAC logo
ITAC Assessment: ME0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Food Additives
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 250,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 8,500
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,064,445 19,215,123
kWh
Fuel Oil #6 $1,639,573 592,616
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,014 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,418

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.4221: Install compressor air intakes in coolest locations $6,418 $150 $6,418
86,753
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $20,697 $40,000 $26,297
1,112,544
kWh
$(-5,600.0)
-
MMBtu
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $899 $1,300 $1,126
19,343
kWh
- $(-227.0)
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,470 $8,260 $3,470
46,893
kWh
- -
05 2.4133: Use most efficient type of electric motors $8,530 $15,100 $8,530
115,475
kWh
- -
TOTAL RECOMMENDED $40,014 $64,810 $45,841
1,381,008
kWh
$(-5,600.0)
-
MMBtu
$(-227.0)
-
MMBtu
TOTAL IMPLEMENTED $6,418 $150 $6,418
86,753
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs