ITAC Assessment: ME0125
ITAC logo
ITAC Assessment: ME0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Golf shoes
NAICS
n/a
SIC 3143: Men's Footwear, Except Athletic
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area 68,800
ft2
Annual Production 175,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,326 780,481
kWh
Fuel Oil #2 $12,979 2,799
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,824 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,873

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.4221: Install compressor air intakes in coolest locations $416 $50 $416
4,396
kWh
-
02 2.2437: Recover waste heat from equipment $2,070 $450 $2,070
21,688
kWh
-
03 2.6218: Turn off equipment when not in use $763 - $763
7,913
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $951 $400 - $951
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $634 $500 $634
6,448
kWh
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $990 $960 $1,240
12,603
kWh
$(-250.0)
-
MMBtu
TOTAL RECOMMENDED $5,824 $2,360 $5,123
53,048
kWh
$701
-
MMBtu
TOTAL IMPLEMENTED $4,873 $1,960 $5,123
53,048
kWh
$(-250.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs