ITAC Assessment: ME0123
ITAC logo
ITAC Assessment: ME0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product HVAC Equip.
NAICS
n/a
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 67,500
ft2
Annual Production 100
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,758 763,775
kWh
LPG $2,845 283
MMBtu
Fuel Oil #2 $6,872 1,076
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,390

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,352 $500 - $2,352
-
MMBtu
02 2.7111: Reduce illumination to minimum necessary levels $2,038 $1,500 $2,038
20,516
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $722 $500 $722
7,327
kWh
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $816 $750 $1,046
10,551
kWh
$(-230.0)
-
MMBtu
05 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $21,216 $52,000 $61,776
623,974
kWh
$(-40,560.0)
-
MMBtu
TOTAL RECOMMENDED $27,144 $55,250 $65,582
662,368
kWh
$(-38,438.0)
-
MMBtu
TOTAL IMPLEMENTED $4,390 $2,000 $2,038
20,516
kWh
$2,352
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs