Assessment Year | 1994 |
---|---|
Principal Product | HVAC Equip. |
NAICS |
n/a
|
SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 50 |
Plant Area |
67,500
ft2
|
Annual Production | 100
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,758 | 763,775 |
kWh
|
$0.089 |
LPG | $2,845 | 283 |
MMBtu
|
$10.05 |
Fuel Oil #2 | $6,872 | 1,076 |
MMBtu
|
$6.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,144 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,390 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,352 | $500 | - |
$2,352
-
MMBtu
|
|
02 | 2.7111: Reduce illumination to minimum necessary levels | $2,038 | $1,500 |
$2,038
20,516
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $722 | $500 |
$722
7,327
kWh
|
- | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $816 | $750 |
$1,046
10,551
kWh
|
$(-230.0)
-
MMBtu
|
|
05 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $21,216 | $52,000 |
$61,776
623,974
kWh
|
$(-40,560.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $27,144 | $55,250 |
$65,582
662,368
kWh
|
$(-38,438.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,390 | $2,000 |
$2,038
20,516
kWh
|
$2,352
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs