ITAC logo
ITAC Assessment: ME0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Turbine Diaphrams
NAICS
n/a
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 90,000
ft2
Annual Production 150
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $335,211 3,690,211
kWh
Fuel Oil #6 $8,630 3,869
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,204 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,831

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $25,173 $80,000 $41,719
485,053
kWh
$(-16,546.0)
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $658 $200 $658
7,327
kWh
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $263 $6,000 $263
3,224
kWh
- -
04 2.1213: Direct warmest air to combustion intake $205 $400 - - $205
-
MMBtu
05 2.2312: Minimize non-essential material in heat treatment process $1,905 $1,500 $1,905
25,498
kWh
- -
TOTAL RECOMMENDED $28,204 $88,100 $44,545
521,102
kWh
$(-16,546.0)
-
MMBtu
$205
-
MMBtu
TOTAL IMPLEMENTED $25,831 $80,200 $42,377
492,380
kWh
$(-16,546.0)
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs