Assessment Year | 1994 |
---|---|
Principal Product | Turbine Diaphrams |
NAICS |
n/a
|
SIC | 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
90,000
ft2
|
Annual Production | 150
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $335,211 | 3,690,211 |
kWh
|
$0.091 |
Fuel Oil #6 | $8,630 | 3,869 |
MMBtu
|
$2.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,204 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,831 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $25,173 | $80,000 |
$41,719
485,053
kWh
|
$(-16,546.0)
-
MMBtu
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $658 | $200 |
$658
7,327
kWh
|
- | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $263 | $6,000 |
$263
3,224
kWh
|
- | - | |
04 | 2.1213: Direct warmest air to combustion intake | $205 | $400 | - | - |
$205
-
MMBtu
|
|
05 | 2.2312: Minimize non-essential material in heat treatment process | $1,905 | $1,500 |
$1,905
25,498
kWh
|
- | - | |
TOTAL RECOMMENDED | $28,204 | $88,100 |
$44,545
521,102
kWh
|
$(-16,546.0)
-
MMBtu
|
$205
-
MMBtu
|
||
TOTAL IMPLEMENTED | $25,831 | $80,200 |
$42,377
492,380
kWh
|
$(-16,546.0)
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs