ITAC Assessment: IA0103
ITAC logo
ITAC Assessment: IA0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product parts for hammer mills
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 96,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,439 1,527,843
kWh
Natural Gas $25,799 5,628
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,046 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,343

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $7,851 $1,430 $7,851
165,592
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,408 $2,337 $1,408
29,601
kWh
-
03 2.8113: Purchase gas directly from a contract gas supplier $6,078 $4,200 - $6,078
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,582 $17,644 $4,582
96,717
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,196 $797 $1,196
25,205
kWh
-
06 2.7135: Install occupancy sensors $497 $308 $497
10,551
kWh
-
07 2.4314: Use synthetic lubricant $217 $168 $217
4,689
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $217 $125 $217
4,689
kWh
-
TOTAL RECOMMENDED $22,046 $27,009 $15,968
337,044
kWh
$6,078
TOTAL IMPLEMENTED $14,343 $20,304 $14,343
302,754
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs