ITAC Assessment: ME0112
ITAC logo
ITAC Assessment: ME0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Wool and Synthetic Yarns
NAICS
n/a
SIC 2282: Yarn Texturizing, Throwing, Twisting, and Winding Mills
Sales Range $1
M
to 5
M
# of Employees 125
Plant Area 90,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 6,696
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $294,651 3,114,009
kWh
LPG $1,116 103
MMBtu
Fuel Oil #2 $2,513 361
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,668 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,325

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Fuel Oil #4 Savings
01 2.4221: Install compressor air intakes in coolest locations $745 $100 $745
7,913
kWh
- -
02 2.2511: Insulate bare equipment $1,935 $3,500 - $1,935
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $408 $5,780 - - $408
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,580 $27,400 $8,580
100,821
kWh
- -
TOTAL RECOMMENDED $11,668 $36,780 $9,325
108,734
kWh
$1,935
-
MMBtu
$408
-
MMBtu
TOTAL IMPLEMENTED $9,325 $27,500 $9,325
108,734
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs