ITAC Assessment: LL0218
ITAC logo
ITAC Assessment: LL0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Rice
NAICS 311212: Rice Milling
SIC 2044: Rice Milling
Sales Range $50
M
to 100
M
# of Employees 71
Plant Area 60,000
ft2
Annual Production 3,875,000
ton
Production Hrs. Annual 7,440
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $703,285 12,787,000
kWh
Electricity Fees $28,131 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,442 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,925

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,480 $11,450 $14,885
270,639
kWh
$595 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,239 $2,920 $8,884
161,529
kWh
$355 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,479 $30 $2,384
43,348
kWh
$95 -
04 2.7134: Use photocell controls $2,331 $300 $2,241
40,751
kWh
$90 -
05 2.7135: Install occupancy sensors $1,514 $300 $1,456
26,477
kWh
$58 -
06 2.7111: Reduce illumination to minimum necessary levels $1,381 $180 $1,328
24,138
kWh
$53 -
07 2.7224: Reduce space conditioning during non-working hours $524 $330 $504
9,158
kWh
$20 -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $494 $350 $183
3,329
kWh
$7 $304
09 2.2693: Use waste heat steam for absorption refrigeration $60,000 $41,000 - - $60,000
TOTAL RECOMMENDED $93,442 $56,860 $31,865
579,369
kWh
$1,273 $60,304
TOTAL IMPLEMENTED $28,925 $15,200 $27,521
500,386
kWh
$1,100 $304
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs