Assessment Year | 2005 |
---|---|
Principal Product | Rice |
NAICS | 311212: Rice Milling |
SIC | 2044: Rice Milling |
Sales Range | $50 M to 100M |
# of Employees | 71 |
Plant Area |
60,000
ft2
|
Annual Production | 3,875,000
ton
|
Production Hrs. Annual | 7,440
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $703,285 | 12,787,000 |
kWh
|
$0.055 |
Electricity Fees | $28,131 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $93,442 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,925 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,480 | $11,450 |
$14,885
270,639
kWh
|
$595 | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,239 | $2,920 |
$8,884
161,529
kWh
|
$355 | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,479 | $30 |
$2,384
43,348
kWh
|
$95 | - | |
04 | 2.7134: Use photocell controls | $2,331 | $300 |
$2,241
40,751
kWh
|
$90 | - | |
05 | 2.7135: Install occupancy sensors | $1,514 | $300 |
$1,456
26,477
kWh
|
$58 | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $1,381 | $180 |
$1,328
24,138
kWh
|
$53 | - | |
07 | 2.7224: Reduce space conditioning during non-working hours | $524 | $330 |
$504
9,158
kWh
|
$20 | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $494 | $350 |
$183
3,329
kWh
|
$7 | $304 | |
09 | 2.2693: Use waste heat steam for absorption refrigeration | $60,000 | $41,000 | - | - | $60,000 | |
TOTAL RECOMMENDED | $93,442 | $56,860 |
$31,865
579,369
kWh
|
$1,273 | $60,304 | ||
TOTAL IMPLEMENTED | $28,925 | $15,200 |
$27,521
500,386
kWh
|
$1,100 | $304 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs