Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Leather
NAICS
n/a
SIC 3111: Leather Tanning and Finishing
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area 81,500
ft2
Annual Production 65,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,979 1,230,950
kWh
Fuel Oil #6 $77,111 28,349
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,625

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $2,132 $2,550 $2,132
21,395
kWh
02 2.4221: Install compressor air intakes in coolest locations $1,445 $2,000 $1,445
-
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,223 $3,420 $1,223
12,309
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,707 $931 $1,707
-
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,118 $3,610 $3,118
31,360
kWh
06 2.3212: Optimize plant power factor $626 $2,000 $626
6,155
kWh
07 2.8123: Pay utility bills on time $324 - $324
3,224
kWh
TOTAL RECOMMENDED $10,575 $14,511 $10,575
74,443
kWh
TOTAL IMPLEMENTED $9,625 $12,511 $9,625
65,064
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs