Assessment Year | 1993 |
---|---|
Principal Product | Lead Wires |
NAICS |
n/a
|
SIC | 3648: Lighting Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 157 |
Plant Area |
56,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,232
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $221,465 | 2,508,793 |
kWh
|
$0.088 |
LPG | $4,680 | 219 |
MMBtu
|
$21.37 |
Fuel Oil #2 | $15,892 | 4,256 |
MMBtu
|
$3.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,156 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,156 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $950 | $200 |
$950
10,844
kWh
|
- | |
02 | 2.2511: Insulate bare equipment | $1,217 | $500 |
$1,217
13,775
kWh
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,808 | - | - |
$1,808
-
MMBtu
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $1,446 | $200 |
$1,446
16,413
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,735 | $50 |
$1,735
16,999
kWh
|
- | |
TOTAL RECOMMENDED | $7,156 | $950 |
$5,348
58,031
kWh
|
$1,808
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,156 | $950 |
$5,348
58,031
kWh
|
$1,808
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs