Assessment Year | 1993 |
---|---|
Principal Product | Machine Components |
NAICS |
n/a
|
SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
56,000
ft2
|
Annual Production | 18,000,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $922,694 | 10,025,205 |
kWh
|
$0.092 |
LPG | $81,946 | 7,663 |
MMBtu
|
$10.69 |
Fuel Oil #2 | $10,054 | 1,709 |
MMBtu
|
$5.88 |
Other Energy | $1,115 | 152 |
MMBtu
|
$7.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $99,486 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,343 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $1,228 | $180 |
$1,228
12,896
kWh
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $1,470 | $1,300 | - | - |
$1,470
-
MMBtu
|
|
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $69,216 | $175,000 |
$69,216
410,317
kWh
|
- | - | |
04 | 2.6224: Schedule baking times of small and large components | $8,100 | $20,000 | - |
$8,100
-
MMBtu
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,120 | $700 | - | - |
$3,120
-
MMBtu
|
|
06 | 2.4133: Use most efficient type of electric motors | $14,129 | $13,680 |
$14,129
153,576
kWh
|
- | - | |
07 | 2.8123: Pay utility bills on time | $2,223 | - |
$2,223
-
kWh
|
- | - | |
TOTAL RECOMMENDED | $99,486 | $210,860 |
$86,796
576,789
kWh
|
$8,100
-
MMBtu
|
$4,590
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,343 | $700 |
$2,223
-
kWh
|
- |
$3,120
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs