ITAC Assessment: BD0058
ITAC logo
ITAC Assessment: BD0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Electric Generator Housings
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 40,000
ft2
Annual Production 650
pieces
Production Hrs. Annual 6,656
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,429 924,678
kWh
Electricity Demand $4,769 2,024
kW-mo/yr
Electricity Fees $2,790 -
Natural Gas $33,968 8,642
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,994 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,631

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $5,160 $5,420 - - $5,160
-
MMBtu
- -
02 2.7135: Install occupancy sensors $1,983 $1,275 $1,773
51,876
kWh
$210
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $877 $2,010 $802
23,447
kWh
$75
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $488 $300 $488
14,361
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $427 $835 $363
7,620
kWh
$64
-
kW-mo/yr
- - -
06 3.2123: Convert to high volume low pressure (hvlp) paint guns - $3,550 - - - - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $59 $7,788 $(-100.0)
(-2,931)
kWh
- - $456
-
lb
$(-297.0)
TOTAL RECOMMENDED $8,994 $21,178 $3,326
94,373
kWh
$349
-
kW-mo/yr
$5,160
-
MMBtu
$456
-
lb
$(-297.0)
TOTAL IMPLEMENTED $7,631 $6,995 $2,261
66,237
kWh
$210
-
kW-mo/yr
$5,160
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs