ITAC Assessment: LT8425
ITAC logo
ITAC Assessment: LT8425
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Pipe Manufacturing
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $100
M
to 500
M
# of Employees 230
Plant Area 249,000
ft2
Annual Production 50,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $927,961 10,662,580
kWh
Electricity Demand $373,706 32,727
kW-mo/yr
Natural Gas $13,561 2,100
MMBtu
Waste Disposal Costs
Water Usage $3,460 1,000
Tgal
Water Disposal $10,476 1,000
Tgal
TOTAL YEARLY COSTS $1,329,163
RECOMMENDED SAVINGS* $10,813 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $811 $402 $647
7,441
kWh
$163
-
kW-mo/yr
02 2.6218: Turn off equipment when not in use $613 $227 $518
5,957
kWh
$94
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,389 $4,701 $9,389
107,925
kWh
-
TOTAL RECOMMENDED $10,813 $5,331 $10,555
121,323
kWh
$258
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs